Photos : NS1070

NS1070
11/8/2020
Making the loop. Having cleared the Allegheny tunnel. NS 956 with the Wabash switches from one to two. Then onto the loop track from CP UN to CP AR. Continuing east through the Portage tunnel. Down to Harrisburg and ultimately Augusta, Ga.
Gallitzin, PA
roadrailer1
1159